Situation:

It lies in the western part of lacomarca of Aviles, on land belonging to the council of Castrillón, in the parish (civil) of Santiago del Monte and near the mouth of the Rio Nalón. Situated 47 km from the capital of the Principality, Oviedo, 40 km and 13 km from Gijon and Aviles are managed by the public entity Spanish Aiports and Air Navigation (AENA).

It is the northernmost of the Spanish airports, and their geographic coordinates 43 º 23.8 ' north latitude and 6 º 2.1' west longitude. Their International Air Transport Association (IATA) code is "OVD" and International Civil Aviation Organization (ICAO) code is "LEAS''. Prevailing winds are from the northeast and northwest in winter and summer in the southeast and southwest. The dense fog that sometimes forms on the near by terrain and make it an airport with some difficulty but also beautiful, particularly the approach to runway 11 either visual or VOR DME threshold which is about 200m of the cliff with a beautiful beach below.

Ground Access :

The airport is accessible by the Highway of the Cantabric Sea (A-8) and the national roard N-632. It taxi, car rental offices and bus stop where the company ALSA connects the airport with the main cities in the Principality, Oviedo (Direct), Gijon and Aviles (Direct), there are also stops in Salinas and Piedras Blancas in the same council of Castrillón. Among the airport services are a tourist information office, three coffes-bar (relatively cheap) one in the boardin area, a restaurant (no more cheap but very good), automatic teller and shops.

Transports:

Price transportation to the airport:
Gijon and Oviedo:
Alsa: round 5,80€ ; roundtrip 11,05€
Taxi: 40€(Gijon) and 45 €(Oviedo)
Aviles:
Alsa: round: 1,20€; roundtrip 2,35€
Taxi: 20€

The bonds are CTA usable areas such as:
Gijon: 2 areas.
Oviedo: 3 areas.
Aviles: 1 area.
These are the minimum zones, whith 3 areas can range from Gijon Airport as well.

History:

Open to the public on June 11, 1968, replacing the Morgal airport, closed for technical reasons. Count from the beginning with the actual runway, a apron parking 17.000m ² and a rolling cross taxiway. In 1980 suffered its first significant expansion due to the world soccer of 1982, doubling the parking area and installing an ILS-CATI, expansion of the terminal building and parking. In 1994 the airport collapses upon arrival to park 14 commercial aircraft in addition to all general aviation aircraft. At the root of this is beginning to develop an expansion plan which suffered considerable delays. In 1996 builds a parallel taxiway to the 29 threshold , and in year 2000 the apron was extended to the east at about 22.500m². Going to have 60.000m² with 7 stands parking of them type 2 medium (Max. Boeing 767 -400) and one type Heavy (Max. Boeing 747), plus a new taxiway link to the parallel taxiway. In 2002, after an unfortunate incident at the meeting of transport ministers of the EU, who were visiting the airport and there was urgent need for improvements because of the fog, after which created the current Airport Ampliation Plan. It expanded the parallel taxiway to the threshold 11 and quick exit to the runway 29, was increased the CATI ILS to CATII DME / III ILS, as well as for lighting aproach, were placed in both new 2 barometer receptors for the landing barometer system, the rolling cross taxiway was demolished and rebuilt again. It expanded terminal building an upper floor with 3 finguers, as well as two gates for flights not Community. Moreover were reformed and expanded parking and service buildings

Accessibility:

Accessibility for the disabled is complete, and its entrances to the ground, bathrooms and elevators for the disabled to access the transit zone.

The only element not accessible by the time of aceder the planes through the gates 1,2,3,4, which function depends on the airlines.

Future:

It is only waiting for the entry of certain improvements in the ILS system and the Radar.

It also plans to extend the runway to 2500m x 60m and a quick exit to the track 11, as well as the platform of parking from 7 to 10 posts of them kind HEAVY 3, the terminal will have to move to increase 3 to 6 fingers , as well as improving the arrivals area, connecting train to the main cities.
Other projects include lighting Approach and ILS/DME CAT-I to 11 runway and a platform maintenance, as well as a General Aviation, which may be the same. In addition to a projected station Cantabric AVE train.